Pictures of the finishing project |
 |
| TITLE |
+ |
- |
| FILE NAME |
+ |
- |
| DATE |
+ |
- |
| POSITION |
+ |
- |
|
|

619 viewsDrive way going in.
|
|

624 viewsRoughed in track layout went very well. Now targeting drivers stand and will adjust layout as needed.
|
|

688 viewsWork on the off road.
|
|

703 viewsNew hobby shop area is all of 1200sqft and will offer a larger selection and bigger inventory of parts. We will also have an area for concessions on race nights in here as well.
|
|

735 viewsA lot of material and time is going into the construction of the building. From extra insulation around the flooring for frost to vapor barriers in the ceilings and walls for long wear. Tom and I have put a lot of thought into the layout of how we would like things to work. Though it may not be perfect right from the start we will adjust to what works best for everyone.
|
|

709 viewsWindows so Tommy can keep and eye on whats going on.
|
|

723 viewsRock is all up ready for mudding and painting.
|
|

801 viewsMudding and taping is about done. Paint is next in the race track area.
|
|

714 views
|
|

1085 viewsBefor the clay was brought in we go to hang a couple decorations. Clay will be hard to get moved around but should make a great surface to race on. The new material holds water very well and should be full of traction.
|
|

768 viewsThis is what we started with after the crew was gone. Have a lot of work to do from here.
|
|

797 viewsSteve thanks for working on our PA system and video system. Sounds and looks great!
|
|
| 14 files on 2 page(s) |
 |
1 |  |
|